As you see Steve has had a delayed.
To catch you up, three weeks ago we had to get a new water heater our three year old, with a twelve year warranty leaked. Lowes was awesome to work with us. That Saturday Steve heard a hissing nose turned the water off & the water meter still moved yep we had to get a new water main.
As for this week, with all the new found water pressure with the new copper line our outdoor sprinklers popped. Yep that's Steve's new task. Steve has had such a great attitude will that these crazy things going on.
As for me I have been a bit stressed out with the whole sha-bang and I have just pretty much watched.
If I get a chance I will add the picture’s from the water main dig.
Tuesday, August 28, 2012
Friday, August 10, 2012
Living Room progress!!
July 28th primered and ready to paint
First coat of Red DeliciousAfter 4 coats of red............
July 30th Painting up the crown molding
We think we have got it!
Gluing up the mantle top
August 2nd
Achievement Unlocked - Fireplace installed!! I control fire via remote control - I am king!Aug 5th
semi-productive day - Got the crown installed, carpet pulled out, fan up, and starting installing the mantle.
Gotta start sanding the floor for refinishing next....
Aug 7th
Started tiling......... This natural slate is a little tricky
Aug 10th Steve got the upper hearth tiled and grouted today. Natural slate is such a pain to grout!